Commercial
Projects
Pique Leasing Center
Berkeley, CA
Project Type: Shell & Tenant Improvement TI
General Contractor: VRGC INC.
Electrical Contractor:
Fampeca Electric & Construction Inc.
Fampeca Electric & Construction Inc. performed the complete electrical scope for both the shell phase and subsequent tenant improvement build-out of the Pique Leasing Center in Berkeley, CA.
Shell Phase
-
Installation of electrical service infrastructure
-
Distribution panels and feeder installations
-
Rough-in for lighting, receptacles, and future tenant systems
-
Preparation for energy-efficient lighting control integration
Tenant Improvement Phase
-
Complete branch circuitry installation
-
Installation and commissioning of Lutron Vive Lighting Control System
-
Interior and exterior LED lighting installation
-
Dedicated circuits for leasing office equipment and common areas
-
Testing, commissioning, and final inspections
All lighting systems were installed in compliance with California Title 24 energy standards, successfully passing inspection and verification requirements.
Service Upgrade & Utility Coordination
A major component of this project involved upgrading two existing meter mains to higher amperage capacity and converting the service to 3-phase power to support expanded load requirements for both residential and commercial occupancy.
This process required:
-
Full utility disconnect coordinated with PG&E
-
Scheduled shutdown to ensure safety and compliance
-
Direct coordination with the City of Berkeley Inspector
-
Building-wide power shutdown executed via underground manhole access
-
Removal and replacement of meter mains
-
Installation of upgraded service equipment
-
Inspection approval and structured re-energization
Following successful inspection and utility authorization, power was safely restored to all multifamily residential units and commercial spaces.
Project Highlights
-
Successful multi-phase execution (Shell + TI)
-
Title 24 compliant lighting control integration
-
Complex service upgrade to 3-phase system
-
Utility and municipal coordination completed without incident
-
Zero safety violations
-
Delivered efficiently with minimal disruption to occupants


Cafe Brusco
Berkeley, CA
Project Type:
Tenant Improvement (TI)
General Contractor: VRGC INC.
Electrical Contractor:
Fampeca Electric & Construction Inc.
Meyer Sound
Berkeley, CA
Project Type:
Tenant Improvement (TI)
General Contractor: VRGC INC.
Electrical Contractor:
Fampeca Electric & Construction Inc.
Fampeca Electric & Construction Inc. delivered a complete electrical tenant improvement for Café Brusco, providing power distribution, commercial kitchen infrastructure, and intelligent lighting control integration.
The project featured Acuity nLight networked lighting controls for enhanced energy efficiency and automation, along with 3-phase power installation to support high-demand kitchen equipment. Our team ensured proper load management, equipment protection, and full code compliance from rough-in through final commissioning.
The result: a reliable, energy-efficient electrical system built to support long-term operational success.
Electrical modifications performed to accommodate installation of a new sound barrier within an active commercial facility.
Scope included relocation of existing electrical circuits and a subpanel to clear structural obstructions and maintain system integrity. All feeders and branch circuits were rerouted, extended, and properly terminated to ensure code compliance, load balance, and uninterrupted operation.
Additionally, we rewired the commercial restroom, upgrading branch circuitry and devices to meet current NEC and local code requirements.
Work was completed with careful coordination to minimize downtime and maintain safe, reliable electrical service throughout the facility.


The Overture
Berkeley, CA
Project Type:
Tenant Improvement (TI)
General Contractor: VRGC INC.
Electrical Contractor:
Fampeca Electric & Construction Inc.
Spats Dive Bar
Berkeley, CA
Project Type:
Tenant Improvement (TI)
General Contractor: VRGC INC.
Electrical Contractor:
Fampeca Electric & Construction Inc.
Crave Subs
Berkeley, CA
Project Type:
Tenant Improvement (TI)
General Contractor: VRGC INC.
Electrical Contractor:
Fampeca Electric & Construction Inc.
Provided electrical infrastructure installation to accommodate new fire alarm equipment, including EMT conduit routing and secure raceway support throughout the facility. Work was executed with careful coordination to maintain operational continuity and meet all NEC and life-safety code requirements.
The project delivered a clean, compliant installation ready for fire alarm integration and inspection approval.
Complete electrical installation for Spats. Scope included installation of a new 200-amp, 3-phase panelboard and new feeder conductors to support the bar’s operational load requirements.
Work involved panel installation, feeder routing and terminations, load balancing, and coordination with utility and local inspection authorities to ensure full NEC compliance. The upgraded distribution system provides reliable power capacity for bar equipment, lighting, refrigeration, and general use loads.
Delivered a safe, code-compliant electrical infrastructure designed for long-term operational reliability.
Performed electrical installations to support operational upgrades at Crave Subs. Scope included installation of code-compliant emergency exit signage and lighting to meet life-safety requirements.
Additionally, provided electrical connections for a new walk-in cooler, including dedicated circuits for interior lighting, temperature control systems, and associated HVAC equipment. All work was completed in accordance with NEC and local code requirements to ensure safe, reliable operation of refrigeration and building systems.
The result: a compliant, fully powered installation supporting both safety and day-to-day business operations.